Understanding Reference Order in MicroStation
Managing the order of references in MicroStation is crucial for achieving the desired visual arrangement of elements within your drawings. Changes in reference order can influence what is apparent above or below other elements in your design.
Steps to Change Reference Order
Access the Reference Dialog
1. Launch MicroStation and open your desired design file.
2. Navigate to the top menu bar, choose **File**, and then select **Reference**. This action will open the Reference dialog box, where all attached reference files will be listed.
Modifying the Update Sequence
1. Within the Reference dialog, you will see the names of your attached references along with their current ascending or descending order.
2. Click on **Settings** located in the dialog box, then choose **Update Sequence**. This will bring up a new window that allows you to modify the order of your references.
Rearranging References
1. In the Update Sequence dialog, you will notice a list of your references.
2. To rearrange the order, select the reference you wish to move.
3. Utilize the **up** or **down** arrow buttons next to the list to adjust the selected reference’s position. Press the up arrow to bring it forward or the down arrow to push it back in the order.
Finalizing Changes
1. After adjusting the order, click **OK** to apply your changes.
2. Ensure to check your design view to confirm that the references appear in the desired order visually.
Additional Tips on Managing References
– Regularly review your reference attachments to avoid clutter and maintain optimal performance.
– Utilize nested references cautiously as they can complicate the reference order and potentially degrade file performance.
– Consider using the **Send to Back** or **Bring to Front** options on selected elements to fine-tune their visibility without altering the overall reference sequence.
Frequently Asked Questions
What are references in MicroStation?
References are external files or drawings that you attach to your current design file. They help in organizing and managing complex designs by allowing elements to be worked on separately while still being visible in the drawing context.
Can the order of references affect performance in MicroStation?
Yes, the order in which references are placed can impact performance, especially when using complex or nested references. A well-managed reference order can help streamline your working environment.
How can I verify my reference order has changed?
To verify, review the design view after adjusting the reference order. You can also select the reference object from the drawing to see its properties and ensure it reflects the new sequence.